Rural New Build - St Albans
Self-Build Homeowner
4 weeks
Project Overview
Foundation works for a new detached house in a rural location. The project included site preparation, piling through clay-with-flints to chalk, and complete drainage system.
The Challenge
Variable clay-with-flints over chalk made foundation depth unpredictable. Some piles encountered voids in chalk (solution features). Rural location meant careful management of access and material deliveries.
Our Solution
Ground investigation identified potential solution features. CFA piling was designed to penetrate minimum 2m into sound chalk. Where voids were encountered, piles were extended or additional piles installed. Raft foundation over piles provided additional security.
Results & Outcome
Despite geological challenges, project completed within schedule. All piles successfully reached sound chalk. Client now living in completed house with no settlement issues. Structural engineer commended the pile installation quality.
Technical Specifications
Project Gallery


Client Testimonial
“Building our own home was daunting, but Mondo Edile made the groundworks phase straightforward. They explained all the geological challenges and solved problems efficiently. Highly recommended for rural sites.”
James and Emma Wilson
Self-Build Clients
Related Projects

Complete groundworks and CFA piling for a two-storey rear extension on a Victorian property. The project included foundation design, piling works, ground beams, and drainage installation.
View Project
Complete foundation package for a mixed-use development including basement excavation, piling works, ground beams, pile caps, drainage systems, and hard landscaping.
View ProjectStart Your Project
Get expert foundation solutions for your project. Contact us for a free consultation and quote.