Residential Extension Foundations - Nazeing
Private homeowner
Approx. 3-4 weeks
Project Overview
Piling, groundworks, and reinforced slab preparation for a residential extension in Nazeing. The works focused on creating a stable base ready for the superstructure.
The Challenge
The site required tight coordination around an existing home, with limited working space and careful sequencing between excavation, piling, and slab preparation.
Our Solution
We set out the piling positions, prepared the working platform, and coordinated groundworks to maintain safe access. Reinforcement and slab preparation followed, keeping the build moving on schedule.
Results & Outcome
A reinforced foundation platform was delivered, leaving the extension ready for the next construction phase.
Technical Specifications
Project Gallery





Related Projects

Complete groundworks and CFA piling for a two-storey rear extension on a Victorian property. The project included foundation design, piling works, ground beams, and drainage installation.
View Project
Complete foundation package for a mixed-use development including basement excavation, piling works, ground beams, pile caps, drainage systems, and hard landscaping.
View ProjectStart Your Project
Get expert foundation solutions for your project. Contact us for a free consultation and quote.